Has anyone met this situation before ?
See the attached screen shot. My trains etc are in light blue. While I was laying the tracks from the station at the bottom left of the screen ("Cataito North", though this isn't clear), the AI put station "Machala South" in the way, so I tunnelled underneath it.
Signal 1, near the centre of the screen, is normal. Signal 2, at the bottom left is a pre-signal.
Every twenty trains or thereabouts, Signal 1 refuses to turn green once a train had left its block and gone into or through the Cataito North. This leads to trains queueing behind Signal 1, and the system eventually getting jammed.
I have tried removing Signal 2 and making Signal 1 the pre-signal. This seemed to reduce the frequency of this failure, but didn't fix it entirely. I did notice that the all trains affected were proceeding under "non-stop" instructions to stations beyond Cataito North, but this may not be significant since there were eight of these compared with only two which stopped at Cataito North. I deleted and rebuilt the trains, but this made no difference.
I also tried correlating the failure with the movements of trains into and out of the AI-controlled station "Machala North", but the signal failure always happened while I was looking somewhere else on the map.
My next step is either to demolish my layout and rebuild elsewhere (tedious) or buy out the AI company which owns Machala South (expensive).
Any ideas, anyone ?
Intermittent signal fault
Moderator: TTDPatch Moderators
Intermittent signal fault
- Attachments
-
- hlg1.jpg (115.43 KiB) Viewed 1243 times
-
- Tycoon
- Posts: 3849
- Joined: 20 Jan 2003 14:51
- Location: Broadstone, Dorset
- Contact:
Who is online
Users browsing this forum: No registered users and 12 guests