Cheers, i've got some kind of integer-arithmetics problem with MiniIn-5476, related to %-unloading:
Train can take 150 crates of goods. Order list:
1) Station A: full load
2) Station B: 40% unload
3) Station C: half unload
4) Station D: full unload
Problem arises at station C: before unloading train has 90 crates of cargo, as it should (0+0+15+25+25+25). After unloading train has 45 crates in total cargo, but per-wagon load shows kinda weird thing: 0+0+65526+5+25+25. So, after unloading at station D, train profit is about 14 millions
Save game attached, look at Dragula Inc., trains 26 & 27.