Hi, I have problem with signals and juction.
Please look at my screeshot,which gives a good example to explan.
When there is a terminate station with all in and out tracks put in the same direction, it only allow on train to come in or leave out.
That doesn't matter if there are only a few trains, but if I got many trains it will be a serious problem. If one train came into the junction, all other trains have to be waiting. It causes trafic jam. I know it is better to use RO-RO station, but sometime you still have to use the terminate station when the maps is complex. Does anyone know a way to help resolve my problem? Like how I shoud put my signals? Thanks!
jxw00100
Engineer
Engineer
Posts: 5
Joined: 09 Jan 2012 14:31

Re: Is there way to let two trains pass junction simultaneou

Post by jxw00100 »

Screenshot:
Attachments
screenshot.jpg
screenshot
(598.92 KiB) Downloaded 8 times
screenshot.jpg
(598.92 KiB) Downloaded 8 times
chrissykes
Engineer
Engineer
Posts: 42
Joined: 25 Oct 2012 22:05

Re: Is there way to let two trains pass junction simultaneou

Post by chrissykes »

the simple answer is no, its hard coded in the exe and is one of the let downs of the game, the only best way to get round this is with the RO-RO station
User avatar
Zakos
Tycoon
Tycoon
Posts: 3980
Joined: 15 Mar 2012 02:48
Contact:

Re: Is there way to let two trains pass junction simultaneou

Post by Zakos »

That's the problem with having a junction with too many tracks. I only do those types of junctions if I only have 2 platforms.
User avatar
SquireJames
Tycoon
Tycoon
Posts: 1863
Joined: 07 Aug 2004 11:56
Skype: squirejames5
Location: Stoke-on-Trent
Contact:

Re: Is there way to let two trains pass junction simultaneou

Post by SquireJames »

Looks like you are wanting Path Based Signals, which do not exist in Loco.
Image
User avatar
Opan
Chairman
Chairman
Posts: 856
Joined: 06 Mar 2010 22:34

Re: Is there way to let two trains pass junction simultaneou

Post by Opan »

Here's a good tutorial that can help you with signaling. http://www.amitrains.co.uk/tutorial/index.htm
jxw00100
Engineer
Engineer
Posts: 5
Joined: 09 Jan 2012 14:31

Re: Is there way to let two trains pass junction simultaneou

Post by jxw00100 »

OK, undertand.
Thanks for all your great help, guys! 8)