Geo Ghost wrote:Ah I see. I was under the impression that LU stock was pretty much all the same kind of height from wheel-base to the door.
Sub-surface stock use normal platform heights, deep tunnel lines use a rather reduced set. The problem arises when you have the two calling at the same platform, ie: the shared Pic/Met section, and the Pic/District interchange platforms (ie: Hammersmith). Can't find a good pic at quick notice, but hopefully this illustrates the difference in door height
Edit: Wait a minute?! £150 million to upgrade a rather rural line (compared to the Birmingham Snow Hill lines at least) with a non-standard electrification system with old trains from over 30 years ago!? Testicles to that. Since it costs about £1.5 million per brand new coach of a Class 172, you could buy 100 new coaches with that. Buy 20 new 3-car sets, capacity problem solved at half the price, and lovely new trains on the line instead of those old clapped-out ex-London things.