There are different views on efficiency possible though. You might view super junctions with optimal flow as highly efficient. But if there's not much gain over a simple level crossing (e.g when there's low traffic) it's a horribly inefficient way to allocate your financial resources. Not that it's the kind of efficiency that really matters in a game like this, where you really have to be creative to find ways to spend your money (sometimes I build a high mountain in the sea for my HQ), but still.osai wrote:Well, you were talking about 'fun' not about 'taste' (imho its very easy to 'just build' some tracks and add some path signals).FooBar wrote:That's personal taste. I like to build somewhat realistic networks. That includes going round mountains and lakes rather than going through or over them. Same for bridges, I only use them I really need them.osai wrote:I don't agree. Check my analysis and more about YAPP.
Of course the tastes differ and I wanted to show some other points of view, i.e. the efficiency of tracks built with path signals.
Regards, Osai
YAPP / PBS Junctions and Stations
Moderator: OpenTTD Developers
Re: YAPP / PBS Junctions and Stations
Re: YAPP / PBS Junctions and Stations
My advice on how to place PBS is at junctions where you want more then one train entering a small junction at the same time and use normal signals after the junction it's self (make sure that you leave enough room for a train to squeeze in).
So Lets say you want a one way 2 platform station with cross overs at both ends.
You want the PBS for trains going out of the station and normal signals after the crossover and no signals between the station and the crossover. (the PBS would stay red if both tracks are taken and if a track is free then the train would reserve the line eliminating another train from reserving the section track.) like Eddi had said earlier.
So Lets say you want a one way 2 platform station with cross overs at both ends.
You want the PBS for trains going out of the station and normal signals after the crossover and no signals between the station and the crossover. (the PBS would stay red if both tracks are taken and if a track is free then the train would reserve the line eliminating another train from reserving the section track.) like Eddi had said earlier.
Re: YAPP / PBS Junctions and Stations

I used a station with two one-way platforms in a game the other day, instead of the usual bi-directional platforms. In this case, I made the PBS signals both face the direction of travel, so a train would stop just short of the platform. No crossovers needed in this design, which was important due to space concerns. Plus, it was the "B" station in an A-B-C-B mail & passenger route, so the trains were only going one way at a time without the need to reverse. (There were also trains running "express" from A-C, but they used a separate bypass track around city B.)
Ben1338 wrote:My advice on how to place PBS is at junctions where you want more then one train entering a small junction at the same time and use normal signals after the junction it's self (make sure that you leave enough room for a train to squeeze in).
So Lets say you want a one way 2 platform station with cross overs at both ends.
You want the PBS for trains going out of the station and normal signals after the crossover and no signals between the station and the crossover. (the PBS would stay red if both tracks are taken and if a track is free then the train would reserve the line eliminating another train from reserving the section track.) like Eddi had said earlier.
Who is John Galt?
- trainboy2004
- Director
- Posts: 572
- Joined: 10 Aug 2005 10:18
- Location: Sittard, The Netherlands
- Contact:
Re: YAPP / PBS Junctions and Stations
Hey,
I'm currently creating a scenario with lots of single track railways. Now I was wondering is the following possible with YAPP/Pre/Basic signals?
I've made a Visio drawing to explain the situation. So I would like to see diagram 1, without the problem of diagram 2.
I'm currently creating a scenario with lots of single track railways. Now I was wondering is the following possible with YAPP/Pre/Basic signals?
I've made a Visio drawing to explain the situation. So I would like to see diagram 1, without the problem of diagram 2.
Re: YAPP / PBS Junctions and Stations
No signals on single tracks and your problem has gone
- trainboy2004
- Director
- Posts: 572
- Joined: 10 Aug 2005 10:18
- Location: Sittard, The Netherlands
- Contact:
Re: YAPP / PBS Junctions and Stations
Is diagram 1 then still possible? I want 2 or more trains after each other between the passing points.
Re: YAPP / PBS Junctions and Stations
If the single track is only one way, no problem.
- trainboy2004
- Director
- Posts: 572
- Joined: 10 Aug 2005 10:18
- Location: Sittard, The Netherlands
- Contact:
Re: YAPP / PBS Junctions and Stations
It's bidirectional look at the arrows. 

Re: YAPP / PBS Junctions and Stations
No chance for this layout if one train comes from the other side (deadlock shown in the 2nd diagram)
-
- Engineer
- Posts: 40
- Joined: 16 Mar 2008 09:49
- Location: Silesia, Czech Republic
- Contact:
Re: YAPP / PBS Junctions and Stations
On single track I sometime use PBS signals witch can be driven throught... but you MUST give ON END of single track... I use them for one universal track for use by Fast and freight trains...
In September 1993 near Bombay, lightning hit a train full of women. And fifty of them in the confusion them jump on tracks, where a train in the opposite direction ran over them.
A little bit of stupit death.
A little bit of stupit death.
Re: YAPP / PBS Junctions and Stations
I don't think that is possible, you will have to have only 1 train on your single track at a time, there is no way the signal can tell which direction the train in the block its guarding is going and let more in the same direction.trainboy2004 wrote:Hey,
I'm currently creating a scenario with lots of single track railways. Now I was wondering is the following possible with YAPP/Pre/Basic signals?
I've made a Visio drawing to explain the situation. So I would like to see diagram 1, without the problem of diagram 2.
- trainboy2004
- Director
- Posts: 572
- Joined: 10 Aug 2005 10:18
- Location: Sittard, The Netherlands
- Contact:
Re: YAPP / PBS Junctions and Stations
Ok thanks.
I saw this types of signals in transport gaint. I thougt it might be possible with PBS and some other signals combined.
I saw this types of signals in transport gaint. I thougt it might be possible with PBS and some other signals combined.
-
- Engineer
- Posts: 18
- Joined: 01 Feb 2008 06:18
Re: YAPP / PBS Junctions and Stations
how did you get double unit signalsAntBUK wrote:Here's me just chucking track down and hoping for the best ^^ lol
Re: YAPP / PBS Junctions and Stations
It is possible to split a track in two sections, but not in three or more. The screenshot shows how it can be done. The german forum has some more tips.trainboy2004 wrote:I thougt it might be possible with PBS and some other signals combined.
-- Michael Lutz
-- Michael Lutz
- trainboy2004
- Director
- Posts: 572
- Joined: 10 Aug 2005 10:18
- Location: Sittard, The Netherlands
- Contact:
-
- Engineer
- Posts: 40
- Joined: 16 Mar 2008 09:49
- Location: Silesia, Czech Republic
- Contact:
Re: YAPP / PBS Junctions and Stations
I think that idea can cause deadlock
In September 1993 near Bombay, lightning hit a train full of women. And fifty of them in the confusion them jump on tracks, where a train in the opposite direction ran over them.
A little bit of stupit death.
A little bit of stupit death.
- trainboy2004
- Director
- Posts: 572
- Joined: 10 Aug 2005 10:18
- Location: Sittard, The Netherlands
- Contact:
Re: YAPP / PBS Junctions and Stations
No, it does it work. I've created a worse case scenario. The train halted before the switch.
Re: YAPP / PBS Junctions and Stations
It can. Two trains can reserve paths to the signal on the two-way section at a time. They will both move to their respective safe waiting points, each side of that signal, and will wait there for each other. This will only clear up if you have set your config so that trains will reverse after a while of waiting, in which event you have no jam but you also have at least one train heading in completely the wrong direction.Gen.Sniper wrote:I think that idea can cause deadlock
If the section is as short as that one pictured, they'll reverse into their previous block, but such a short track doesn't warrant this layout. Longer stretches will make trains proceed down the track parallel to the one on which they arrived.
edit: Actually, let me retract that statement completely. The signal in the middle is two signals, which would mean overlapping reservations. Yes, it works, and no, it doesn't deadlock. My mistake; should have engaged my brain as I looked.
Last edited by Brianetta on 03 Oct 2008 22:03, edited 1 time in total.
PGP fingerprint: E66A 9D58 AA10 E967 41A6 474E E41D 10AE 082C F3ED
-
- Engineer
- Posts: 40
- Joined: 16 Mar 2008 09:49
- Location: Silesia, Czech Republic
- Contact:
Re: YAPP / PBS Junctions and Stations
Try to place PBS on each end of the single track... I use them for long single track as overtaking and as help in heavy traffic....
PS: sorry for my worse english
PS: sorry for my worse english
- Attachments
-
- Silesian Railways, 9. lis 1965.png
- in red "boxes" are PBS "drive throught" signals
- (335.55 KiB) Downloaded 232 times
In September 1993 near Bombay, lightning hit a train full of women. And fifty of them in the confusion them jump on tracks, where a train in the opposite direction ran over them.
A little bit of stupit death.
A little bit of stupit death.
Re: YAPP / PBS Junctions and Stations
Edit: Got it! Divided up a single track into three blocks with PBS:
The trick is to have the two signals in the middle face each other. Then a train waiting to enter the single track will wait until the leading train enters the more distant block before entering the first block. Once a train passes the second signal, it reserves a path past the junction, so no deadlocks.
Tried it with combo signals, but it caused deadlocks, and one train would not enter the single track until the other left, making the multiple blocks irrelevant.
The trick is to have the two signals in the middle face each other. Then a train waiting to enter the single track will wait until the leading train enters the more distant block before entering the first block. Once a train passes the second signal, it reserves a path past the junction, so no deadlocks.

Tried it with combo signals, but it caused deadlocks, and one train would not enter the single track until the other left, making the multiple blocks irrelevant.