Hazelrah wrote:
2) Build to first red light. Print an error message saying it did not complete the entire strech of track. Fail if train is in the way before first red light.
4) Build to the first train. Print an error message saying it did not complete the entire strech of track.
OK. One moment... I choose... the number hmm 2, the 4 with curry and a coke
Can you combine these two?
If I want to autocomplete a track with a signal on it,
why would there be a signal? (I am signalling it now)
Answer: That signal is there for a reaseon! Don't ignore it.
(That could also mean to stop at any signal... confused myself)
Second: As I alredy tried to autocomplete a track with trains on
it, I went mad, since that is impossible. If you could signal it to the next train,
that would be cool. But the user should get a message,
otherwise he has to check the whole route carefully. That would suck.
That's are my first thoughts about it.
Now I'm going to reproduce the crash I mentioned.
klogg