Hi all,
I posted a new project (Project 4) in the TTDX challenge. This one is about fixing two stations that are the core of the network, and therefore require a good fix to cope with more and more traffic.
Follow the link below and click in Project 4, or feel free to explore any other project of the Challenge!
http://www.geocities.com/pep_catala/
Cheers!
New Challenge
Hi pcatala
Challenge 4 was very difficult and i spent hours and hours on it. However here is my responce which i am so proud of.
Plan includes:
1. Keep mainline clear as much as possible.
2. Used 4 tracks in congested areas.
3. Replaced bridges and tunnel to allow closer signaling.
4. Improved terminals to promote faster movement.
5. Retain existing strategy.
6. Instituted beautification plan.
Bye Rollo
Challenge 4 was very difficult and i spent hours and hours on it. However here is my responce which i am so proud of.

Plan includes:
1. Keep mainline clear as much as possible.
2. Used 4 tracks in congested areas.
3. Replaced bridges and tunnel to allow closer signaling.
4. Improved terminals to promote faster movement.
5. Retain existing strategy.
6. Instituted beautification plan.
Bye Rollo
- Attachments
-
- TRP01.SV1
- (300.23 KiB) Downloaded 109 times
Who is online
Users browsing this forum: No registered users and 7 guests