Page 1 of 1

Upgrading tram tracks in future years

Posted: 11 Apr 2013 05:01
by kamnet
Similar to how TTRS and CanRoads/NARoads have introduced new road surfaces in a future year, would it be possible to do the same with tram tracks?

Re: Upgrading tram tracks in future years

Posted: 11 Apr 2013 06:38
by OzTrans
kamnet wrote:Similar to how TTRS and CanRoads/NARoads have introduced new road surfaces in a future year, would it be possible to do the same with tram tracks?
NA/Can-Roads already do that. There are subtle differences between tram tracks on dirt/brick and bitumen roads; e.g. look at the stops. Implementation is the same as with roads; just using action-5 instead of action-A.