{TTDP} Wallyweb Productions
Wallyweb Productions *The Nars Valley Project*
Coal train #0173 went past its lifetime and was replaced by #0105, an EMD SD9 with 61:16 gearing and higher capacity hopper cars.
- Attachments
-
- #0105 EMD SD9 coal train
- New_Coal_Train_0105.png (129.53 KiB) Viewed 4594 times
Last edited by wallyweb on 08 Oct 2007 06:58, edited 1 time in total.
Wallyweb Productions *The Nars Valley Project*
It was decided to prepare for a future phase by building the access to the Lakeville East Subdivision as well as sidings to the steel mill whose stations will be built when the iron mines are opened.
- Attachments
-
- Access to the Lakeville East Sudivision.
- Lakeville_East_Sudivision_Marker.png (146.46 KiB) Viewed 4589 times
-
- Midville Steel Mill sidings.
- Midville_Steel_Sidings.png (146.92 KiB) Viewed 4590 times
Last edited by wallyweb on 08 Oct 2007 06:59, edited 2 times in total.
Wallyweb Productions *The Nars Valley Project*
Having failed at its environment commitments, NVP was advised by the Local Authorities that work on the new Midville Station would have to be delayed until proof of better a financial situation was shown. Unfortunately, NVP had insufficient resources for bribes.
Meanwhile, it was decided to realign the South Falls bypass to accommodate longer trains. The Riverton bypass was believed to be fine as it was.
It was also time to renew NVPTC's road vehicles, which should greatly help restore our outstanding relationship with Midville's Local Authorities. We opted to upgrade to model 2 double decker buses. The wood trucks would be replaced with the same model 2's already in service. As productivity at Winterlude Forest #1 was very good, four wood trucks were added to the service. Due to low productivity at South Falls Gravel Pit #1, only two gravel trucks were renewed with the other two being placed in storage at the Midville Auto depot.
Meanwhile, it was decided to realign the South Falls bypass to accommodate longer trains. The Riverton bypass was believed to be fine as it was.
It was also time to renew NVPTC's road vehicles, which should greatly help restore our outstanding relationship with Midville's Local Authorities. We opted to upgrade to model 2 double decker buses. The wood trucks would be replaced with the same model 2's already in service. As productivity at Winterlude Forest #1 was very good, four wood trucks were added to the service. Due to low productivity at South Falls Gravel Pit #1, only two gravel trucks were renewed with the other two being placed in storage at the Midville Auto depot.
- Attachments
-
- Realigned South Falls bypass
- South_Falls_Bypass.png (148.29 KiB) Viewed 4587 times
-
- New Model 2 Double Decker Buses
- New_Model_2_Buses.png (145.6 KiB) Viewed 4579 times
Last edited by wallyweb on 08 Oct 2007 07:01, edited 1 time in total.
Wallyweb Productions *The Nars Valley Project*
It was also decided to replace the firewood train #0280 with an EMD SW1500, #0211, pulling six 50' box cars to handle increased output from the sawmill, the second coal train, #0381 was replaced with an EMD SD45, #0301 and the Budd RDC's were renewed with another unit added to the consists.
- Attachments
-
- The new #0211 EMD SW1500 with six 50' boxcars.
- EMD_SW1500_0211.png (132.37 KiB) Viewed 4575 times
-
- The new #0301 EMD SD45 coal train
- EMD_SD45_0301.png (162.06 KiB) Viewed 4572 times
-
- 5 unit Budd RDC consists
- Budd_RDC_5_Unit.png (141.04 KiB) Viewed 4571 times
Last edited by wallyweb on 08 Oct 2007 07:02, edited 1 time in total.
Wallyweb Productions *The Nars Valley Project*
The Midville Local Authorities were finally sufficiently placated to allow for construction of the new Midville Station.
- Attachments
-
- The new Gare Centrale style Midville Station.
- New_Midville_Station.png (134.58 KiB) Viewed 4562 times
-
- Midville after track realignments
- Midville_After.png (193.61 KiB) Viewed 4556 times
Last edited by wallyweb on 08 Oct 2007 07:04, edited 1 time in total.
Wallyweb Productions *The Nars Valley Project*
INTERMISSION
[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]
Why not visit our commissary conveniently located in your refrigerator?
Our feature will continue shortly.
[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]
Why not visit our commissary conveniently located in your refrigerator?
Our feature will continue shortly.
wallyweb on tt-forums: Screenshots - Wallyweb World - Projects & Releases
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
Re: {TTDP} Wallyweb Productions *The Nars Valley Project*
For some strange reason our cinema patrons have been getting mighty hungry and thirsty so we have sent our crews up to Plainston to film the opening of The Isle of Nars agricultural region.
wallyweb on tt-forums: Screenshots - Wallyweb World - Projects & Releases
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
Wallyweb Productions *The Nars Valley Project*
Please return to your seats!
The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.
Thank you,
The management
/lights dimming - curtain opening
The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.
Thank you,
The management
/lights dimming - curtain opening
wallyweb on tt-forums: Screenshots - Wallyweb World - Projects & Releases
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
Wallyweb Productions *The Nars Valley Project*
With the completion of the new Midville Station, the citizens were pressing their respective Local Authorities to demand express passenger service between Summerville and Midville and between Midville and Winterlude. Seeing as how these runs could be rather lucrative, NVP decided to move on this immediately using UAC Turbo Trains.
- Attachments
-
- NVPRR Express #1003 UAC Turbo going up the South Falls South Subdivision
- Express_1003.png (150.38 KiB) Viewed 4440 times
-
- NVPRR Express #1103 UAC Turbo climbing through the Winterlude Falls loop
- Express_1103.png (139.85 KiB) Viewed 4438 times
Last edited by wallyweb on 08 Oct 2007 07:05, edited 1 time in total.
Wallyweb Productions *The Nars Valley Project*
Truck 13T80 was retired and replaced by a local bus service was established for Plainston with a Normal Model 3 #13B00. Similarly, truck 14T80 was retired and replaced by an express bus service between Lakeville and Westport using an Express Model 1 #14B00.
- Attachments
-
- Plainston's new local bus service.
- Bus_13B00.png (143.01 KiB) Viewed 4434 times
-
- An Express bus service between Lakeville and Westport.
- Bus_14B00.png (146.86 KiB) Viewed 4434 times
Last edited by wallyweb on 08 Oct 2007 07:08, edited 1 time in total.
Wallyweb Productions *The Nars Valley Project*
The new express services were indeed very lucrative and NVP was able to retire its debt by the end of the year. It was time to press on with Phase 11.
Phase 11 would be connecting Summerville to Plainston and be known as Plainston West Subdivision. Plainston is located at the eastern end of a high mountain valley, a prime agricultural area. The line is important to move livestock and produce down to the Summerville food plant. The major challenges would be the switchbacks required to climb up Plainston Escarpment to the valley to the west of Summerville. Once completed, passenger service was provided to Plainston with an EMD GP38-2 with 60:17 gearing and with one mail, a sleeper and two passenger coaches.
Phase 11 would be connecting Summerville to Plainston and be known as Plainston West Subdivision. Plainston is located at the eastern end of a high mountain valley, a prime agricultural area. The line is important to move livestock and produce down to the Summerville food plant. The major challenges would be the switchbacks required to climb up Plainston Escarpment to the valley to the west of Summerville. Once completed, passenger service was provided to Plainston with an EMD GP38-2 with 60:17 gearing and with one mail, a sleeper and two passenger coaches.
- Attachments
-
- The switchbacks up Plainston Escarpment.
- Plainston_Escarpment.png (141.48 KiB) Viewed 4429 times
-
- Plainston West Subdivision
- Plainston_West_Subdivision.png (145.86 KiB) Viewed 4425 times
Last edited by wallyweb on 08 Oct 2007 07:09, edited 1 time in total.
Wallyweb Productions *The Nars Valley Project*
Once passenger service was established, a transfer station would be set up to gather grain and livestock using GP38-2's geared at 65:12 for shipment down to the Summerville food plant. Food would then be shipped as goods throughout the island. Two Model 3 box trucks from Summerville Auto Sales would deliver into Summerville. An EMD GP38-2 geared at 60:17 for speed and hauling five 40' reefers would serve South Falls and Plainston. A pair of EMD GP38-2's geared at 60:17 and hauling ten 50' reefers would service Midville. Other trains to service the other communities would be brought on line later as other farms were brought into the enterprise.
- Attachments
-
- Plainston Co-op handles grain and Plainston Feedlot handles livestock.
- Plainston_Coop_Feedlot.png (122.62 KiB) Viewed 4424 times
-
- Summerville Foods - Feeding the island.
- Summerville_Foods.png (139.34 KiB) Viewed 4421 times
Last edited by wallyweb on 08 Oct 2007 07:11, edited 1 time in total.
Wallyweb Productions *The Nars Valley Project*
Plainston Farms 1 and 2 were serviced by Model 3 trucks purchased from Plainston Truck & Auto Sales. The other farms would require rail service. Farms 3 and 4 would receive the first rail service at a later date.
- Attachments
-
- Plainston Farms 1 and 2
- Plainston_Farms_1_2.png (120.93 KiB) Viewed 4418 times
Last edited by wallyweb on 08 Oct 2007 07:13, edited 1 time in total.
Wallyweb Productions *The Nars Valley Project*
INTERMISSION
[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]
Why not visit our commissary conveniently located in your refrigerator?
Our feature will continue shortly.
[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]
Why not visit our commissary conveniently located in your refrigerator?
Our feature will continue shortly.
wallyweb on tt-forums: Screenshots - Wallyweb World - Projects & Releases
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
Re: {TTDP} Wallyweb Productions *The Nars Valley Project*
I think I've just found my nomination for next months Screenshot competition in the form of the switchbacks up Plainston Escarpment. Fantastic shot, so simple but so effective. 

Re: {TTDP} Wallyweb Productions *The Nars Valley Project*
Thank you Ameecher.
You may want to take a seat and follow the next episode first though. 


wallyweb on tt-forums: Screenshots - Wallyweb World - Projects & Releases
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
Wallyweb Productions *The Nars Valley Project*
Please return to your seats!
The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.
Thank you,
The management
/lights dimming - curtain opening
The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.
Thank you,
The management
/lights dimming - curtain opening
Wallyweb Productions *The Nars Valley Project*
Before continuing with passenger rail service development, it was noted that the two coal services were showing problems. NVP Collieries 1 and 2 were nearing depletion. Productivity had fallen accordingly. It was time to reassess the services and perhaps open new mines as phase 12.
It was decided to open collieries #3 and #5 with a local engine shop to service train 1918, an EMD GP38-2 geared at 65:12 and hauling 6 large hoppers with up to 198 tons of coal to Colliery #6, where it would be transferred to train 0317, the former 0390 recently upgraded to an EMD SD70MAC hauling 10 large hoppers with 330 tons of coal to the Midville Power Plant. It soon became apparent that 6 hoppers were two more than required and train 1918 was reduced to four hoppers and gearing was changed to 62:15 with a small increase in maximum speed.
It was decided to open collieries #3 and #5 with a local engine shop to service train 1918, an EMD GP38-2 geared at 65:12 and hauling 6 large hoppers with up to 198 tons of coal to Colliery #6, where it would be transferred to train 0317, the former 0390 recently upgraded to an EMD SD70MAC hauling 10 large hoppers with 330 tons of coal to the Midville Power Plant. It soon became apparent that 6 hoppers were two more than required and train 1918 was reduced to four hoppers and gearing was changed to 62:15 with a small increase in maximum speed.
- Attachments
-
- New collieries 3 and 5 and Engine shops
- NVP_Collieries_3_5.png (163.96 KiB) Viewed 4342 times
-
- NVPRR coal train 1918
- EMD_GP38-2_1918.png (142.67 KiB) Viewed 4343 times
-
- NVPRR coal train 0317
- EMD_SD70MAC _0317.png (148.93 KiB) Viewed 4341 times
Wallyweb Productions *The Nars Valley Project*
Phase 13 would be connecting Plainston to Eastport and be made up of the Plainston North Subdivision and the Eastport South Subdivision. Eastport is located on the western side of the island and is surrounded by forests and lakes. It is known for its hunting and fishing and indeed this was the motivation for NVP to locate its headquarters in the region. Passenger and mail service was initiated with #2020, another EMD GP38-2 geared for speed at 60:17.
Laying the track for the Plainston North Subdivision would have the added benefit of providing Plainston Farms 3 and 4 with rail access to Plainston Feedlot and Co-op, which, on their own, would have been difficult to justify financially.
Laying the track for the Plainston North Subdivision would have the added benefit of providing Plainston Farms 3 and 4 with rail access to Plainston Feedlot and Co-op, which, on their own, would have been difficult to justify financially.
- Attachments
-
- Plainston North Subdivision with Plainston Farms 3 and 4
- Plainston_North_Subdivision.png (170.96 KiB) Viewed 4339 times
-
- Eastport South Subdivision
- Eastport South Subdivision.png (141.19 KiB) Viewed 4339 times
-
- Train 2020 EMD GP38-2 arrives at Eastport
- Eastport_Plainston_2020.png (145.2 KiB) Viewed 4341 times
Wallyweb Productions *The Nars Valley Project*
Rail service to Plainston Farms 3 and 4 was initiated. Productivity levels required that a seperate service be provided to each farm. EMD GP38-2's geared at 65:12 were used throughout. 2121 livestock and 2221 grain with 11 cars each served farm #3 and 2341 and 2421 with seven cars each, served farm #4. With the increased volumes at Plainston Feedlot and Plainston Co-op, those services each received an additional train as well, 2522 and 2622 respectively.
- Attachments
-
- Plainston Farm #3
- 2121_2221_EMD_GP38-2.png (115.76 KiB) Viewed 4336 times
-
- Plainston Farm #4
- 2321_2421_EMD_GP38-2.png (93.86 KiB) Viewed 4336 times
-
- Plainston Feedlot and Co-op
- 2522_2622_EMD_GP38-2.png (123.99 KiB) Viewed 4336 times
Who is online
Users browsing this forum: No registered users and 2 guests