Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

Now that the steel mill was receiving coal, it was time to arrange for some iron production. A railhead with a service area would be built at NVP Iron Mine #1. Iron ore from mines #2 and #3 would be trucked to the railhead. It was estimated that an EMD GP60 hauling six hoppers should be able to handle the loads into Midville Steel Mill. An EMD SD70MAC hauling three coil cars and three flat cars would haul the output of the steel mill down to Summerville Factory. Iron ore from other mines in the region would be brought on line later as demand increased.
Attachments
Iron Mine #2 38T15; Iron Mine #3 39T15; Iron Mine #1 EMD GP60 #3125
Iron Mine #2 38T15; Iron Mine #3 39T15; Iron Mine #1 EMD GP60 #3125
Iron_Mines_123.png (161.35 KiB) Viewed 2746 times
Steel Mill EMD SD70MAC #3226
Steel Mill EMD SD70MAC #3226
First_Steel_Shipment.png (146.47 KiB) Viewed 2745 times
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

Once the steel industry was set up and producing, it would be time to look at reliability. The prime concern would be the end of life of the EMD GP38-2. Spare parts were scarce and maintenance was questionable. The frequent breakdowns were putting a strain on the network. It was decided to retire these engines from the fleet. In the process, other factors would be considered such as replacing cabooses with payloadable wagons and EOT devices. The EMD SW1500 would be continued for its economy on short hauls, but maintenance would be forced rather than as needed.
Attachments
EMD GP38-2 replacements
EMD GP38-2 replacements
New_Vehicles_2004.png (147.46 KiB) Viewed 2741 times
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

INTERMISSION

[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]

Why not visit our commissary conveniently located in your refrigerator?

Our feature will continue shortly.
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Re: {TTDP} Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

Hey! Why is the commissary empty? Where did everybody go? OH1 I know! They all went to that shiny new one over and Ben_K's. Wait until they find out he's out of popcorn buckets! :twisted:
Well, they'd better hurry on back. The next episode of The Nars Valley Project is about to start.

HEY! YOU! YES YOU WITH THE BEN_K SODA CUP! YOU CAN'T BRING THAT IN HERE! Usher! Please show that man out, unless he buys our soda, in the generic, unbranded cup that he can carry into other cinemas.

A little preview ... our plot is about to take another twist. It's got more twists than one of Ben_K's pretzels.
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

Please return to your seats!

The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.

Thank you,

The management

/lights dimming - curtain opening
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

Mr. Web felt that he had been here before, but he just knew that he had never ever faced such a predicament previously. He attributed his feelings to a false sense of déja vue. The Nars Valley Project was in serious financial difficulty. Running costs were still exceedingly high, and there remained four more EMD GP38-2's to be replaced, let alone much needed RV replacements, passenger coach upgrades and the development of the oil and brick industries and the lumber demanded by Summerville Factory. He knew he could access more credit, but without some significant changes, the interest alone would prove disastrous. The problem was traffic congestion through those four single track sections up the Nars River valley. They would have to be double tracked if the contract was to be completed on time. The Local Authorities would have to accept the resulting impact on local environment or the project would have to be abandoned. The cost to double track would be horrendous, but it had to be done, especially in view of the anticipated increase in traffic.

Having made a successful presentation to the Local Authorities, Mr. Web now needed to secure sufficient financing. Returning to the Starship, Mr. Web entered the secure communications pod and contacted the Business Ultimatums Management Section (BUMS). He made his case to them. They were not entirely happy with events. The BUMS agreed to Mr. Web's request reluctantly, but there would be a price to pay ... no bonuses for the next 1000 years. They would allow Mr. Web to use the Calamity Handling Technology to access $100,000,000 with the understanding that the Organized Transport Tyranny Department would be kept out of the loop. There was much interdepartmental rivalry. Mr. Web did not know why but he felt a strong sense of relief with this condition. Converting to Nars dollars produced ND$200,000,000 from which the outstanding $300,000 loan was repaid, leaving a balance of ND$199,700,000.
Attachments
($1,483,202) Ouch!
($1,483,202) Ouch!
Jul_9_2004.png (103.67 KiB) Viewed 2670 times
$199,700,000 YES!
$199,700,000 YES!
Jul_10_2004.png (103.29 KiB) Viewed 2669 times
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

With cash in hand, the remaining four EMD GP38-2's would be replaced. Next, the RV fleet would be refurbished where necessary.
Attachments
Remaining EMD GP38-2 replacements
Remaining EMD GP38-2 replacements
New_Trains_2004.png (155.62 KiB) Viewed 2661 times
New double decker buses and normal model 4 wood and gravel trucks
New double decker buses and normal model 4 wood and gravel trucks
New_RVs_2004.png (151.33 KiB) Viewed 2657 times
New normal bus and express bus and normal model 4 wood trucks
New normal bus and express bus and normal model 4 wood trucks
New_RVs_2005.png (154.39 KiB) Viewed 2653 times
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

INTERMISSION

[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]

Why not visit our commissary conveniently located in your refrigerator?

Our feature will continue shortly.
User avatar
Raichase
Moderizzle
Moderizzle
Posts: 11509
Joined: 15 Dec 2002 00:58
Location: Sydney, Australia. Usually at work in the underground railway station...
Contact:

Re: {TTDP} Wallyweb Productions *The Nars Valley Project*

Post by Raichase »

Poor bugger, you're losing money like a sieve! I'm enjoying the story though, normally I'd be all "boo, hiss, no cheating", but this time it's very entertaining.

Probably the only screenie thread I'm following at the moment, given my slightly-limited free time :]
Posted by Raichase. Visit my Flickr! Gallery, Blog (get a feed of everyone at once at Planet TT-Forums).
Raichase - Perfect timing, all the time: [13:37] * Now talking in #tycoon
ImageImage
Official TT-Dave Worley Fan Club
Official TT-Andel-in-a-pink-hat Fan Club
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Re: {TTDP} Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

Raichase wrote:normally I'd be all "boo, hiss, no cheating"
What cheating? The BUMS approved it.! 8)
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

Please return to your seats!

The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.

Thank you,

The management

/lights dimming - curtain opening
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Re: {TTDP} Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

With the vehicle updates done, it would be time to begin the double tracking of the Nars River Valley as Phase 17. Where feasible, bridges would be replaced with the faster tubular bridges. The first section would be the South Falls South Subdivision.
Attachments
South Falls South Subdivision single track
South Falls South Subdivision single track
South_Falls_South_Single.png (169.5 KiB) Viewed 2567 times
Why we are double tracking
Why we are double tracking
South_Falls_Congestion.png (146.41 KiB) Viewed 2571 times
South Falls South Subdivision double track
South Falls South Subdivision double track
South_Falls_South_Double.png (168.23 KiB) Viewed 2569 times
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

The second section would be the South Falls North Subdivision.
Attachments
South Falls North Subdivision single track
South Falls North Subdivision single track
South_Falls_North_Single.png (167.25 KiB) Viewed 2563 times
South Falls North Subdivision double track
South Falls North Subdivision double track
South_Falls_North_Double.png (155.29 KiB) Viewed 2564 times
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

Moving on through to the north of Midville, the third section would be the Riverton South Subdivision.
Attachments
Riverton South Subdivision single track
Riverton South Subdivision single track
Riverton_South_Single.png (166.05 KiB) Viewed 2561 times
Riverton South Subdivision double track
Riverton South Subdivision double track
Riverton_South_Double.png (152.17 KiB) Viewed 2559 times
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

The fourth section would be the Riverton North Subdivision which would complete the Nars River Valley double tracking phase. This would be the most difficult section to double due to the citizens desire to protect Winterlude Falls. The solution would be to run the south bound track behind Quarry Mountain and through a tunnel exiting near Riverton. The Winterlude Falls suspension bridges would remain for aesthetic reasons.

Construction costs were significant as expected but revenues over expenses were already improving.
Attachments
Riverton North Subdivision single track
Riverton North Subdivision single track
Riverton_North_Single.png (154.52 KiB) Viewed 2555 times
Riverton North Subdivision double track
Riverton North Subdivision double track
Riverton_North_Double.png (150.51 KiB) Viewed 2555 times
An improved financial situation.
An improved financial situation.
Jan_1_2006.png (103.67 KiB) Viewed 2553 times
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

INTERMISSION

[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]

Why not visit our commissary conveniently located in your refrigerator?

Our feature will continue shortly.
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Re: {TTDP} Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

Hmmm ... Seems to be a bit of action near the projection booth. Oh! Here's the announcement. Time to head back to our seats.
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

Please return to your seats!

The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.

Thank you,

The management

/lights dimming - curtain opening
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

Moving on to Phase 18, it was decided to review the rolling stock. For some reason the passenger coaches weren't as modern one would expect. They would be replaced. Mr.Web had a strange feeling this was done once before. The remaining cabooses would be replaced with payloadable wagons and EOT devices as well. Also, the two gravel trains would receive new EMD GP60's to replace the now unreliable SW1500's.

Some of the RV's were now seen to be showing their age and would be replaced as well before breakdowns became an issue.
Attachments
New passenger coaches and freight wagons
New passenger coaches and freight wagons
New_Passenger_Stock.png (145.42 KiB) Viewed 2457 times
Updated freight stock
Updated freight stock
New_Freight_Stock.png (133.35 KiB) Viewed 2457 times
New normal bus and express bus and farm and food transport with model upgrades.
New normal bus and express bus and farm and food transport with model upgrades.
New_RVs_2006.png (149.4 KiB) Viewed 2454 times
User avatar
wallyweb
Tycoon
Tycoon
Posts: 6102
Joined: 27 Nov 2004 15:05
Location: Canada

Wallyweb Productions *The Nars Valley Project*

Post by wallyweb »

With the rolling stock updated, the second part of Phase 18 would be maximizing the forest service and shipping lumber down to Summerville Factory. This would require expanding the shipping area adding a rail dock for lumber and adding rail to the receiving area. It would also be necessary to reserve space for expansion of the sawmill itself as some of the forests showed potential for high productivity. The shipping area would be relocated across Sawmill Road with an underground access to the production area. This would leave room for a future second sawmill plant as well as making room for the rail receiving yards.
Attachments
The sawmill facilities before expansion
The sawmill facilities before expansion
Winterlude_Sawmill_Before.png (133.56 KiB) Viewed 2449 times
The sawmill facilities after expansion
The sawmill facilities after expansion
Winterlude_Sawmill_After.png (129.01 KiB) Viewed 2448 times