{TTDP} Wallyweb Productions
Wallyweb Productions *The Nars Valley Project*
Now that the steel mill was receiving coal, it was time to arrange for some iron production. A railhead with a service area would be built at NVP Iron Mine #1. Iron ore from mines #2 and #3 would be trucked to the railhead. It was estimated that an EMD GP60 hauling six hoppers should be able to handle the loads into Midville Steel Mill. An EMD SD70MAC hauling three coil cars and three flat cars would haul the output of the steel mill down to Summerville Factory. Iron ore from other mines in the region would be brought on line later as demand increased.
- Attachments
-
- Iron Mine #2 38T15; Iron Mine #3 39T15; Iron Mine #1 EMD GP60 #3125
- Iron_Mines_123.png (161.35 KiB) Viewed 2742 times
-
- Steel Mill EMD SD70MAC #3226
- First_Steel_Shipment.png (146.47 KiB) Viewed 2741 times
Wallyweb Productions *The Nars Valley Project*
Once the steel industry was set up and producing, it would be time to look at reliability. The prime concern would be the end of life of the EMD GP38-2. Spare parts were scarce and maintenance was questionable. The frequent breakdowns were putting a strain on the network. It was decided to retire these engines from the fleet. In the process, other factors would be considered such as replacing cabooses with payloadable wagons and EOT devices. The EMD SW1500 would be continued for its economy on short hauls, but maintenance would be forced rather than as needed.
- Attachments
-
- EMD GP38-2 replacements
- New_Vehicles_2004.png (147.46 KiB) Viewed 2737 times
Wallyweb Productions *The Nars Valley Project*
INTERMISSION
[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]
Why not visit our commissary conveniently located in your refrigerator?
Our feature will continue shortly.
[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]
Why not visit our commissary conveniently located in your refrigerator?
Our feature will continue shortly.
wallyweb on tt-forums: Screenshots - Wallyweb World - Projects & Releases
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
Re: {TTDP} Wallyweb Productions *The Nars Valley Project*
Hey! Why is the commissary empty? Where did everybody go? OH1 I know! They all went to that shiny new one over and Ben_K's. Wait until they find out he's out of popcorn buckets!
Well, they'd better hurry on back. The next episode of The Nars Valley Project is about to start.
HEY! YOU! YES YOU WITH THE BEN_K SODA CUP! YOU CAN'T BRING THAT IN HERE! Usher! Please show that man out, unless he buys our soda, in the generic, unbranded cup that he can carry into other cinemas.
A little preview ... our plot is about to take another twist. It's got more twists than one of Ben_K's pretzels.

Well, they'd better hurry on back. The next episode of The Nars Valley Project is about to start.
HEY! YOU! YES YOU WITH THE BEN_K SODA CUP! YOU CAN'T BRING THAT IN HERE! Usher! Please show that man out, unless he buys our soda, in the generic, unbranded cup that he can carry into other cinemas.
A little preview ... our plot is about to take another twist. It's got more twists than one of Ben_K's pretzels.
wallyweb on tt-forums: Screenshots - Wallyweb World - Projects & Releases
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
Wallyweb Productions *The Nars Valley Project*
Please return to your seats!
The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.
Thank you,
The management
/lights dimming - curtain opening
The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.
Thank you,
The management
/lights dimming - curtain opening
Wallyweb Productions *The Nars Valley Project*
Mr. Web felt that he had been here before, but he just knew that he had never ever faced such a predicament previously. He attributed his feelings to a false sense of déja vue. The Nars Valley Project was in serious financial difficulty. Running costs were still exceedingly high, and there remained four more EMD GP38-2's to be replaced, let alone much needed RV replacements, passenger coach upgrades and the development of the oil and brick industries and the lumber demanded by Summerville Factory. He knew he could access more credit, but without some significant changes, the interest alone would prove disastrous. The problem was traffic congestion through those four single track sections up the Nars River valley. They would have to be double tracked if the contract was to be completed on time. The Local Authorities would have to accept the resulting impact on local environment or the project would have to be abandoned. The cost to double track would be horrendous, but it had to be done, especially in view of the anticipated increase in traffic.
Having made a successful presentation to the Local Authorities, Mr. Web now needed to secure sufficient financing. Returning to the Starship, Mr. Web entered the secure communications pod and contacted the Business Ultimatums Management Section (BUMS). He made his case to them. They were not entirely happy with events. The BUMS agreed to Mr. Web's request reluctantly, but there would be a price to pay ... no bonuses for the next 1000 years. They would allow Mr. Web to use the Calamity Handling Technology to access $100,000,000 with the understanding that the Organized Transport Tyranny Department would be kept out of the loop. There was much interdepartmental rivalry. Mr. Web did not know why but he felt a strong sense of relief with this condition. Converting to Nars dollars produced ND$200,000,000 from which the outstanding $300,000 loan was repaid, leaving a balance of ND$199,700,000.
Having made a successful presentation to the Local Authorities, Mr. Web now needed to secure sufficient financing. Returning to the Starship, Mr. Web entered the secure communications pod and contacted the Business Ultimatums Management Section (BUMS). He made his case to them. They were not entirely happy with events. The BUMS agreed to Mr. Web's request reluctantly, but there would be a price to pay ... no bonuses for the next 1000 years. They would allow Mr. Web to use the Calamity Handling Technology to access $100,000,000 with the understanding that the Organized Transport Tyranny Department would be kept out of the loop. There was much interdepartmental rivalry. Mr. Web did not know why but he felt a strong sense of relief with this condition. Converting to Nars dollars produced ND$200,000,000 from which the outstanding $300,000 loan was repaid, leaving a balance of ND$199,700,000.
- Attachments
-
- ($1,483,202) Ouch!
- Jul_9_2004.png (103.67 KiB) Viewed 2666 times
-
- $199,700,000 YES!
- Jul_10_2004.png (103.29 KiB) Viewed 2665 times
Wallyweb Productions *The Nars Valley Project*
With cash in hand, the remaining four EMD GP38-2's would be replaced. Next, the RV fleet would be refurbished where necessary.
- Attachments
-
- Remaining EMD GP38-2 replacements
- New_Trains_2004.png (155.62 KiB) Viewed 2657 times
-
- New double decker buses and normal model 4 wood and gravel trucks
- New_RVs_2004.png (151.33 KiB) Viewed 2653 times
-
- New normal bus and express bus and normal model 4 wood trucks
- New_RVs_2005.png (154.39 KiB) Viewed 2649 times
Wallyweb Productions *The Nars Valley Project*
INTERMISSION
[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]
Why not visit our commissary conveniently located in your refrigerator?
Our feature will continue shortly.
[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]
Why not visit our commissary conveniently located in your refrigerator?
Our feature will continue shortly.
wallyweb on tt-forums: Screenshots - Wallyweb World - Projects & Releases
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
- Raichase
- Moderizzle
- Posts: 11509
- Joined: 15 Dec 2002 00:58
- Location: Sydney, Australia. Usually at work in the underground railway station...
- Contact:
Re: {TTDP} Wallyweb Productions *The Nars Valley Project*
Poor bugger, you're losing money like a sieve! I'm enjoying the story though, normally I'd be all "boo, hiss, no cheating", but this time it's very entertaining.
Probably the only screenie thread I'm following at the moment, given my slightly-limited free time![Pleased :]](./images/smilies/pleased.gif)
Probably the only screenie thread I'm following at the moment, given my slightly-limited free time
![Pleased :]](./images/smilies/pleased.gif)
Posted by Raichase. Visit my Flickr! Gallery, Blog (get a feed of everyone at once at Planet TT-Forums).
Raichase - Perfect timing, all the time: [13:37] * Now talking in #tycoon


Official TT-Dave Worley Fan Club
Official TT-Andel-in-a-pink-hat Fan Club
Raichase - Perfect timing, all the time: [13:37] * Now talking in #tycoon


Official TT-Dave Worley Fan Club
Official TT-Andel-in-a-pink-hat Fan Club
Re: {TTDP} Wallyweb Productions *The Nars Valley Project*
What cheating? The BUMS approved it.!Raichase wrote:normally I'd be all "boo, hiss, no cheating"

wallyweb on tt-forums: Screenshots - Wallyweb World - Projects & Releases
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
Wallyweb Productions *The Nars Valley Project*
Please return to your seats!
The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.
Thank you,
The management
/lights dimming - curtain opening
The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.
Thank you,
The management
/lights dimming - curtain opening
Re: {TTDP} Wallyweb Productions *The Nars Valley Project*
With the vehicle updates done, it would be time to begin the double tracking of the Nars River Valley as Phase 17. Where feasible, bridges would be replaced with the faster tubular bridges. The first section would be the South Falls South Subdivision.
- Attachments
-
- South Falls South Subdivision single track
- South_Falls_South_Single.png (169.5 KiB) Viewed 2563 times
-
- Why we are double tracking
- South_Falls_Congestion.png (146.41 KiB) Viewed 2567 times
-
- South Falls South Subdivision double track
- South_Falls_South_Double.png (168.23 KiB) Viewed 2565 times
Wallyweb Productions *The Nars Valley Project*
The second section would be the South Falls North Subdivision.
- Attachments
-
- South Falls North Subdivision single track
- South_Falls_North_Single.png (167.25 KiB) Viewed 2559 times
-
- South Falls North Subdivision double track
- South_Falls_North_Double.png (155.29 KiB) Viewed 2560 times
Wallyweb Productions *The Nars Valley Project*
Moving on through to the north of Midville, the third section would be the Riverton South Subdivision.
- Attachments
-
- Riverton South Subdivision single track
- Riverton_South_Single.png (166.05 KiB) Viewed 2557 times
-
- Riverton South Subdivision double track
- Riverton_South_Double.png (152.17 KiB) Viewed 2555 times
Wallyweb Productions *The Nars Valley Project*
The fourth section would be the Riverton North Subdivision which would complete the Nars River Valley double tracking phase. This would be the most difficult section to double due to the citizens desire to protect Winterlude Falls. The solution would be to run the south bound track behind Quarry Mountain and through a tunnel exiting near Riverton. The Winterlude Falls suspension bridges would remain for aesthetic reasons.
Construction costs were significant as expected but revenues over expenses were already improving.
Construction costs were significant as expected but revenues over expenses were already improving.
- Attachments
-
- Riverton North Subdivision single track
- Riverton_North_Single.png (154.52 KiB) Viewed 2551 times
-
- Riverton North Subdivision double track
- Riverton_North_Double.png (150.51 KiB) Viewed 2551 times
-
- An improved financial situation.
- Jan_1_2006.png (103.67 KiB) Viewed 2549 times
Wallyweb Productions *The Nars Valley Project*
INTERMISSION
[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]
Why not visit our commissary conveniently located in your refrigerator?
Our feature will continue shortly.
[subliminal messages]I am hungry and thirsty I am hungry and thirsty I am hungry and thirsty[/subliminal messages]
Why not visit our commissary conveniently located in your refrigerator?
Our feature will continue shortly.
wallyweb on tt-forums: Screenshots - Wallyweb World - Projects & Releases
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
Re: {TTDP} Wallyweb Productions *The Nars Valley Project*
Hmmm ... Seems to be a bit of action near the projection booth. Oh! Here's the announcement. Time to head back to our seats.
wallyweb on tt-forums: Screenshots - Wallyweb World - Projects & Releases
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
wallyweb on Simuscape: Projects - Releases
Other Stuff: TTDPatch 2.6 "Nightly" download - cirdan's OpenTTD branch (New Map Features)
Screenshot Of The Month Contest Winner: August 2015 - Tied May 2016 - January 2018 - December 2018 - May 2019
Wallyweb Productions *The Nars Valley Project*
Please return to your seats!
The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.
Thank you,
The management
/lights dimming - curtain opening
The commissary is closed and we are about to continue with our presentation.
In consideration of the other viewers and the guy in the projector room, please observe the NO_SMOKING sign and please REFRAIN_FROM _POSTING_NEW_MESSAGES until the next intermission.
Thank you,
The management
/lights dimming - curtain opening
Wallyweb Productions *The Nars Valley Project*
Moving on to Phase 18, it was decided to review the rolling stock. For some reason the passenger coaches weren't as modern one would expect. They would be replaced. Mr.Web had a strange feeling this was done once before. The remaining cabooses would be replaced with payloadable wagons and EOT devices as well. Also, the two gravel trains would receive new EMD GP60's to replace the now unreliable SW1500's.
Some of the RV's were now seen to be showing their age and would be replaced as well before breakdowns became an issue.
Some of the RV's were now seen to be showing their age and would be replaced as well before breakdowns became an issue.
- Attachments
-
- New passenger coaches and freight wagons
- New_Passenger_Stock.png (145.42 KiB) Viewed 2453 times
-
- Updated freight stock
- New_Freight_Stock.png (133.35 KiB) Viewed 2453 times
-
- New normal bus and express bus and farm and food transport with model upgrades.
- New_RVs_2006.png (149.4 KiB) Viewed 2450 times
Wallyweb Productions *The Nars Valley Project*
With the rolling stock updated, the second part of Phase 18 would be maximizing the forest service and shipping lumber down to Summerville Factory. This would require expanding the shipping area adding a rail dock for lumber and adding rail to the receiving area. It would also be necessary to reserve space for expansion of the sawmill itself as some of the forests showed potential for high productivity. The shipping area would be relocated across Sawmill Road with an underground access to the production area. This would leave room for a future second sawmill plant as well as making room for the rail receiving yards.
- Attachments
-
- The sawmill facilities before expansion
- Winterlude_Sawmill_Before.png (133.56 KiB) Viewed 2445 times
-
- The sawmill facilities after expansion
- Winterlude_Sawmill_After.png (129.01 KiB) Viewed 2444 times
Who is online
Users browsing this forum: Amazon [Bot], Bing [Bot] and 4 guests