Page 1 of 1

The problem of synchronization signaling

Posted: 16 Dec 2009 18:25
by Johann
Rail Route witch I manage is the construction of a mixed. First half of the section is bidirectional (two tracks lines), second half of the section is completed ramification enough to enable safe passage of two trains. In places where is connection two tracks in a single, traffic lights are blocked showing the red light despite the unoccupied route. I tried describe the problem author of TTDPatch, but from what I understand he have not system computerized for "Windows" only "Mac OS X" which prevents check this problem.

Below annexes. Regards Johann

Re: The problem of synchronization signaling

Posted: 18 Apr 2013 18:10
by orudge
Problem solved, lock requested.