Hi there.
does someone have a solution for this problem?
I have two one way tracks 1 is a very long tunnel and the second is a normal track. I wanted to use this normal track as a "backup" So if the tunnel is full the train hase to go over the normal track. I've put some signals in front of the tunnel opening and the normal track. But the train (in whatever configuration the tracks are laid) will keep chosing the tunnel. This one is very long so it takes a while before that is cleared and it give congestion on the tracks before the tunnel. See also screenshot. Please could someone help me out?
thanx in advange.
train behavior track change
Re: train behavior track change
Moved this from the Locomotion Problems section.
@ asterix152 - Check which forum you're posting in, you'd have got liitle or no help where you originally posted!
@ asterix152 - Check which forum you're posting in, you'd have got liitle or no help where you originally posted!
|||| My OTTD/TTDP pics ||||Currently slighty obsessed with getting Platinum Trophies||||Retired moderator||||
-
- Engineer
- Posts: 3
- Joined: 01 Oct 2009 19:14
Re: train behavior track change
Problem solved. two way sign added.
- Nextra
- Route Supervisor
- Posts: 511
- Joined: 03 Apr 2007 23:12
- Location: In your base, taking your Belonging
Re: train behavior track change
Whilst the problem maybe be fixed, I would however like to reference you to this guide on signal construction which I believe would help smooth out your train network to run more efficently.
Interested in helping out where ever possible.
Who is online
Users browsing this forum: No registered users and 14 guests