Is there a way to simulate PTC?
Perhaps a railtype with crash-avoidance protocols that costs extra?
Maybe have all track tiles between two signals of identical type treated as also having signals of that type?
Positive Train Control?
Moderator: OpenTTD Developers
Re: Positive Train Control?
Why not just place signals on every tiles then? This will 1) increase the construction cost and 2) increase the maintenance cost.Maybe have all track tiles between two signals of identical type treated as also having signals of that type?
The only time a train collides with another train is when the constructor (player) makes a mistake. Train protection systems are normally placed to prevent disasters when operators (train engineers) make a mistake or are stricken with unforseen events (sickness etc).
Re: Positive Train Control?
OpenTTD already behaves as though there's PTC at every signal. Trains stop instantly at every red, and collisions never occur unless you manually tamper with the system (remove signals or force trains past them).
Temporary Permanent signature filling text. Content coming soon delayed indefinitely! Oh, and I have had a screenshot thread.
Linux user (XMonad DWM/KDE, Arch), IRC obsessive and rail enthusiast. No longer building robots; now I ring church bells.
Author of an incredibly boring stickied post about NewGRFs.
Linux user (XMonad DWM/KDE, Arch), IRC obsessive and rail enthusiast. No longer building robots; now I ring church bells.
Author of an incredibly boring stickied post about NewGRFs.
Who is online
Users browsing this forum: No registered users and 26 guests