These are the only two ways I could come up with, but with the bottom one the trains don't use the second track and they get stuck with the top one. All the signals are path signals.
Re: How to set up train shunting/waiting zones?
in the top one, turn all the signals backwards. should work that way
-
- Engineer
- Posts: 11
- Joined: 07 May 2021 16:55
Re: How to set up train shunting/waiting zones?
If you are building a single-track line with passing loops, make sure that the branches of each loop use one-way path signals facing opposite directions. Otherwise, a couple of trains going in the same direction can cause a deadlock.